MWG/ BP Cassia B 48” Modification Project

Onshore Scope:

›Prefab; Piping, Structural Steel Deck Sections, Load out

Offshore Scope:

›Labor supply
›Demolition of piping and structural steel
›Install 48” piping and 48” pig launcher
›Install Structural Deck sections
›Blasting and Painting
›Pre Commissioning and Commissioning