MWG/ BP Cassia B 48” Modification Project

Onshore Scope:

Prefab; Piping, Structural Steel Deck Sections, Load out

Offshore Scope:

Labor supply
Demolition of piping and structural steel
Install 48” piping and 48” pig launcher
Install Structural Deck sections
Blasting and Painting
Pre Commissioning and Commissioning