Mechanical, Piping, E&I, Civil and Structural Works Duration-13 months
Onshore Scope:
| › | Prefabrication |
| › | Piping and Structural Steel Deck Sections (Hipps Module, Stair Towers, Laydown extension, sub sea mezzanine) |
| › | Load out |
| › | Material Storage |
Offshore Scope:
| › | Installation of Structural Steel Deck Sections (Hipps Module, Stair Towers, Laydown extension, sub sea mezzanine) |
| › | Mechanical Installation Services on the accommodation upgrade, West crane deck strengthening, Asset Integrity Brownfield Execution (AIBE) Shutdown works |
Fluor/BG Starfish