Over the past decade, TOFCO has installed management systems and processes to maximize efficiency and ensure quality control for all projects.  As a result, the company has successfully fabricated nine major and numerous brownfield projects both onshore and offshore.

We are considered the best in the region with a worldwide reputation for exceptional safety standards and high quality work.  TOFCO has established the skilled workforce, resources and management processes necessary to see your project through from conception to completion.

Featured Project: bpTT Juniper

Completion Date January 2017
Work Scope Deck Fabrication, Offshore hookup
Duration 26 months
Overall Tonnage 5,200 tons
Deck Weight 5,101
Max Resource 750

›   Historical project, largest platform ever constructed in T&T

›  Normally Unmanned Installation (NUI)

›  Utilization of 98% Local workforce

›  2,000,000 man hours without a lost time incident

›  750 people working during peak construction

›  Marked TOFCO’s largest single lift at 715 metrics

›  Quality craftsmanship

›  Delivered 100% complete at sail away

Greenfield Projects

BpTT-Serrette

bpTT Serrette

Completion Date February 2010
Work Scope Deck and Jacket Fabrication
Duration 15 Months
Overall Tonnage 3,000 tons
Deck weight 1,020 tons
Jacket weight 1,980 tons
Jacket Length 306 feet
Max Resources 240

 

Last of the 5 BpTT NUI’s completed
BpTT-Savonette

bpTT Savonette

Completion Date 2009
Work Scope Deck and Jacket Fabrication
Duration 16 months
Overall Tonnage 2,800 tons
Deck weight 900 tons
Jacket weight 1,900 tons
Jacket Length 321 feet
Max Resource 230

 

Cashmina clone
Simultaneous with Poinsettia
Jacket with skirts in original design
Commissioned and leak tested prior to loadout
OG-Oilbird

EOG Toucan

Completion Date 2009
Work Scope Deck Fabrication
Duration 15 months
Deck Length 25,748 S/S
Overall Tonnage 2,000 tons
Deck weight 2,000 tons
Max Resource 100

 

› Simultaneous with Poinsettia and Savonette

BP-Poinsettia

BGTT Poinsettia

Completion Date February 2010
Work Scope Deck Fabrication, Offshore hookup
Duration 18 Months
Overall Tonnage 4,300
Deck weight 3,648
Max Resource 380
Extensive participation in engineering phase
Offshore hook up by TOFCO
It took 96 crew members 35 days to hook up this topside deck
Successfully reached mechanical completion without injury, before target date, under budget
Recipient of 2009 Overseas Project of the Year Award from the UK-based Association of Project Management (APM)
BG presented TOFCO with the President’s HSSE Recognition Award for TOFCO’s contribution to HSSE for Safety Step-up
BpTT-Cashima

bpTT Cashima

Completion Date 2007
Work Scope Deck, Jacket and Subsea Spool
Duration 16 months
Overall Tonnage 2,544 tons
Deck weight 700 tons
Jacket weight 1,844 tons
Jacket Length 290 feet
Max Resource 275
Topsides clone to Mango
Simultaneous at the TOFCO facility with Mango
First use of skirt pile sleeves
First use of grouting system and grippers
Commissioned and leak tested prior to loadout
Topsides clone to Mango
BpTT-Mango

bpTT Mango

Completion Date 2007
Work Scope Deck, Jacket and Subsea Spool
Duration 16 months
Overall Tonnage 2,419 tons
Deck weight 700 tons
Jacket weight 1,719 tons
Jacket Length 263 feet
Max Resource 240

 

Simultaneous with Cashima
Commissioned and leak tested prior to loadout
Established loadout scenarios for future
OG-Oilbird

EOG Oilbird

Completion Date 2006
Work Scope Deck, Jacket and Subsea Spool
Duration 16 months
Overall Tonnage 2,894
Deck weight 1,300 tons
Jacket weight 1,594 tons
Jacket Length 255 feet
Max Resource 220

 

First EOG project built in Trinidad
Testimony of platform continuity at TOFCO
Project was delivered on schedule
Zero Lost Time Incidents
BpTT-Cannonball

bpTT Cannonball

Completion Date

2005

Work Scope

Deck, Jacket & Subsea Spool

Overall Tonnage

1,800

Deck weight

600 tons

Jacket weight

1,200 tons

Jacket Length

275 feet

Duration

12 months

Max Resource

130

FIRST platform ever to be designed & constructed in T&T

Delivery was two weeks ahead of schedule

Zero lost-time incidents

The weld defect repair rate was far below industry standards

It helped to foster in-country engineering

BROWNFIELD PROJECTS

tofco-projects-bpTT-TROC-

bpTT TROC

Completion Date In Progress
Work Scope Mechanical, Piping, E&I, Civil and Structural

EOG Pelican Compression Platform

Main Contractor
Piping Demolition
Install Pre Fabricated Pipe
Assist with installation of compressor packages
Scaffold Installation
Bolt Torquing and Hydro Testing

McDermott/ BG Hibiscus 4A Compression Project

Main Contractor: Providing labor, materials and equipment to support with the Brownfield Hook Up & Pre-Commissioning and Commissioning.

Constructability Input and Development of Work Packs
Fabrication and Installation of piping and pipe supports
Offshore Blasting and Painting
Electrical Support
Onshore storage

MWG/ BP Cassia B 48” Modification Project

Onshore Scope:

Prefab; Piping, Structural Steel Deck Sections, Load out

 

Offshore Scope:

Labor supply
Demolition of piping and structural steel
Install 48” piping and 48” pig launcher
Install Structural Deck sections
Blasting and Painting
Pre Commissioning and Commissioning

Fluor/BG Starfish

Mechanical, Piping, E&I, Civil and Structural Works Duration-13 months

Onshore Scope:

Prefabrication
Piping and Structural Steel Deck Sections (Hipps Module, Stair Towers, Laydown extension, sub sea mezzanine)
Load out
Material Storage

 

Offshore Scope:

Installation of Structural Steel Deck Sections (Hipps Module, Stair Towers, Laydown extension, sub sea mezzanine)
Mechanical Installation Services on the accommodation upgrade, West crane deck strengthening, Asset Integrity Brownfield Execution (AIBE) Shutdown works
complete

BgTT Dolphin Life Boat Deck

Work Scope Fabrication, Installation and Testing of a Life Boat Deck

 

This project was completed on schedule with zero incidents